THIS ITEM IS NON-RETURNABLE
They're made from either low cost 1/16-inch thick or, for a heavy duty brick stencil, 1/8-inch thick polyethylene plastic. This plastic brick stencil kit can be reused for multiple applications.
See the full line of sidewalk stencils that are available from Stop-Painting.
Stencil Material: Polyethylene plastic (LDPE)
Brick Size: 3-1/2" x 7-½" (sq. ft. 128)
THIS ITEM IS NON-RETURNABLE
Q: What is the difference between the 1/16-inch thick and the 1/8-inch thick material?
A: Both 1/16-inch thick and 1/8-inch thick are made of polyethene plastic. Both are durable materials that will provide multiple uses. The 1/16-inch thick material is about the thickness of a quarter and is a more economical option. The 1/8-inch thick material is about the thickness of a nickel and penny stacked and is the preferred grade for contractor use.
Q: How long will the stencil last?
A: These high quality stencils are very durable. The life of the stencil is based on several factors including cleaning, storage and frequency of use.
Q: How do you recommend cleaning the stencils?
A: No paint thinner is required to maintain your stencil. Do not allow your stencils to soak in paint thinner. Our stencils are made of Low Density Polyethene plastic. This is a very flexible, non-hazardous, tough and non-porous plastic. Built up paint will peel off quite easily.
Q: How should I store the stencil?
A: Stencils should be stored flat and face down at room temperature. Be very careful handling the plastic should you need to use your stencil in weather colder than 50 degrees. The stencils become more stiff and brittle in cold temperatures.
Q: Do you make custom stencils?
A: Yes. Send your graphic with size requirements for a quote. Custom stencils have an approximate 1 week lead time.
Q: Can I purchase material to make my own stencil?
A: Yes. You can purchase plastic sheet stencil material to make your own stencil.
Q: How quickly will my stencil ship?
A: Stencils typically ship in 1-2 business days. Custom stencils or standard items that have to be cut require a 1 week lead time.